Most bid problems are not about price. They are about what the bid leaves out. A clear bid lists what is included, what is excluded, who handles plans and permits, and how payments follow the work. Use this page to check yours.
Try the free AI Bid Checker
Paste or upload your bid. It checks missing scope, the written exclusions list, deposit and payment terms, and gives you questions to send the contractor. It can also compare two or three bids side by side.
Open the Bid Checker →Runs in Google Gemini (a free Google account is required). Remove names, addresses, and phone numbers before uploading. General information only — not a professional opinion or legal advice.
10 things to confirm in every bid
- License. An active CSLB license, the right classification for the work, and a business name that matches the bid.
- Scope, line by line. A single "complete job" price with no breakdown makes it hard to know what you are paying for.
- A written exclusions list. Anything not written as included or excluded tends to become a dispute or a change order later.
- Plans and permits. Who prepares the drawings, structural engineering, and Title 24 energy calculations? Who pulls the permit? Are permit, school, impact, and utility fees included?
- Allowances. A dollar amount for each (cabinets, tile, fixtures) and how overages are billed.
- Payments. A deposit within the legal limit, and progress payments tied to completed work — never ahead of it.
- Change orders. Written, priced, and signed before extra work starts.
- Unforeseen conditions. How hidden problems — dry rot, termites, buried lines, required code upgrades — will be priced.
- Insurance. Certificates for liability and workers' compensation.
- Lien releases and warranty. Lien releases from subcontractors and suppliers as you pay, and a written workmanship warranty.
California rules worth knowing
Deposit limit on home improvement contracts
California Business and Professions Code Section 7159.5 limits the down payment on a home improvement contract to $1,000 or 10 percent of the contract price, whichever is less. Section 7159 also requires the contract to state that limit in bold type. Whether a particular project — for example, a new detached ADU — counts as a home improvement contract depends on the facts, so ask the contractor how their deposit complies.
When a license is required
Unlicensed work in California is limited to small jobs under $1,000 in labor and materials that need no building permit and where the person hires no workers. Larger work, or work that needs a permit, requires a licensed contractor. Check any contractor with the Check a License tool at cslb.ca.gov — including what it shows for bond and workers' compensation.
Unpermitted ADUs built before 2020
AB 2533, effective January 1, 2025, created a path to permit many ADUs and junior ADUs built without permits before January 1, 2020. If your project involves an existing unpermitted unit, confirm the details with your city before pricing the work.
Typical 2026 cost ranges in LA & Orange County
These are typical ranges reported by 2026 LA and Orange County cost guides, cross-checked with our own completed work. They are a sanity check, not a quote. Construction cost only unless noted.
| Project | Typical range | Notes |
|---|---|---|
| Detached ADU (new) | ~$300–500 / sf | Small units (under ~600 sf) and difficult sites run higher. Design/engineering (~$10–15K) and permit/city fees (~$5–25K) are usually extra. |
| Garage conversion ADU | ~$90K–220K total | Existing slab, walls, and roof reduce cost; utility separation drives the range. |
| Kitchen remodel | ~$20–50K refresh ~$50–100K mid-range ~$85–180K+ full gut / high-end | Layout changes, cabinetry, and appliances drive the spread. |
| Bathroom remodel | ~$15–40K refresh ~$40–90K full gut | Moving plumbing and shower size matter most. |
| Room addition | ~$200–450 / sf ground floor ~$350–600 / sf second story | Second stories need structural upgrades to the existing house. |
Reference point: a 590 sf detached ADU we completed in LA County in 2026 came in at about $465–485 per square foot, construction only, including fire sprinklers, a water meter upsize, and asbestos abatement. Permit "valuation" amounts on city records are not real costs. Ranges updated November 2026.
How to compare two or three bids
- Level the scope. Put the bids side by side, one row per item. Mark each as included, excluded, or unclear.
- Check the basics. A license number on the bid, a lawful deposit, a written exclusions list, and payments that follow the work. Fix these in writing before going further.
- Compare price only after scope matches. A bid far below the others usually has missing scope. Ask each bidder to price the gaps.
- Then judge the contractor. References, recent projects, and CSLB complaint history — a document can't tell you about workmanship.
The most reliable way to compare contractors is to have permit-ready plans first, then ask everyone to bid the same plans. Without plans, bids are educated guesses.