Homeowner guide · LA & Orange County

How to check a construction bid before you sign.

What to confirm, what California law requires, what projects typically cost in LA and Orange County in 2026, and how to choose between bids — from a licensed architect who is also a licensed general contractor.

한국어로 보기

Most bid problems are not about price. They are about what the bid leaves out. A clear bid lists what is included, what is excluded, who handles plans and permits, and how payments follow the work. Use this page to check yours.

Try the free AI Bid Checker

Paste or upload your bid. It checks missing scope, the written exclusions list, deposit and payment terms, and gives you questions to send the contractor. It can also compare two or three bids side by side.

Open the Bid Checker →

Runs in Google Gemini (a free Google account is required). Remove names, addresses, and phone numbers before uploading. General information only — not a professional opinion or legal advice.

10 things to confirm in every bid

  1. License. An active CSLB license, the right classification for the work, and a business name that matches the bid.
  2. Scope, line by line. A single "complete job" price with no breakdown makes it hard to know what you are paying for.
  3. A written exclusions list. Anything not written as included or excluded tends to become a dispute or a change order later.
  4. Plans and permits. Who prepares the drawings, structural engineering, and Title 24 energy calculations? Who pulls the permit? Are permit, school, impact, and utility fees included?
  5. Allowances. A dollar amount for each (cabinets, tile, fixtures) and how overages are billed.
  6. Payments. A deposit within the legal limit, and progress payments tied to completed work — never ahead of it.
  7. Change orders. Written, priced, and signed before extra work starts.
  8. Unforeseen conditions. How hidden problems — dry rot, termites, buried lines, required code upgrades — will be priced.
  9. Insurance. Certificates for liability and workers' compensation.
  10. Lien releases and warranty. Lien releases from subcontractors and suppliers as you pay, and a written workmanship warranty.

California rules worth knowing

Deposit limit on home improvement contracts

California Business and Professions Code Section 7159.5 limits the down payment on a home improvement contract to $1,000 or 10 percent of the contract price, whichever is less. Section 7159 also requires the contract to state that limit in bold type. Whether a particular project — for example, a new detached ADU — counts as a home improvement contract depends on the facts, so ask the contractor how their deposit complies.

When a license is required

Unlicensed work in California is limited to small jobs under $1,000 in labor and materials that need no building permit and where the person hires no workers. Larger work, or work that needs a permit, requires a licensed contractor. Check any contractor with the Check a License tool at cslb.ca.gov — including what it shows for bond and workers' compensation.

Unpermitted ADUs built before 2020

AB 2533, effective January 1, 2025, created a path to permit many ADUs and junior ADUs built without permits before January 1, 2020. If your project involves an existing unpermitted unit, confirm the details with your city before pricing the work.

Typical 2026 cost ranges in LA & Orange County

These are typical ranges reported by 2026 LA and Orange County cost guides, cross-checked with our own completed work. They are a sanity check, not a quote. Construction cost only unless noted.

ProjectTypical rangeNotes
Detached ADU (new)~$300–500 / sfSmall units (under ~600 sf) and difficult sites run higher. Design/engineering (~$10–15K) and permit/city fees (~$5–25K) are usually extra.
Garage conversion ADU~$90K–220K totalExisting slab, walls, and roof reduce cost; utility separation drives the range.
Kitchen remodel~$20–50K refresh
~$50–100K mid-range
~$85–180K+ full gut / high-end
Layout changes, cabinetry, and appliances drive the spread.
Bathroom remodel~$15–40K refresh
~$40–90K full gut
Moving plumbing and shower size matter most.
Room addition~$200–450 / sf ground floor
~$350–600 / sf second story
Second stories need structural upgrades to the existing house.

Reference point: a 590 sf detached ADU we completed in LA County in 2026 came in at about $465–485 per square foot, construction only, including fire sprinklers, a water meter upsize, and asbestos abatement. Permit "valuation" amounts on city records are not real costs. Ranges updated November 2026.

How to compare two or three bids

  1. Level the scope. Put the bids side by side, one row per item. Mark each as included, excluded, or unclear.
  2. Check the basics. A license number on the bid, a lawful deposit, a written exclusions list, and payments that follow the work. Fix these in writing before going further.
  3. Compare price only after scope matches. A bid far below the others usually has missing scope. Ask each bidder to price the gaps.
  4. Then judge the contractor. References, recent projects, and CSLB complaint history — a document can't tell you about workmanship.

The most reliable way to compare contractors is to have permit-ready plans first, then ask everyone to bid the same plans. Without plans, bids are educated guesses.

Common questions

On a home improvement contract, no more than $1,000 or 10 percent of the contract price, whichever is less (Business and Professions Code Section 7159.5). Whether your project — such as a new detached ADU — is a home improvement contract depends on the facts, so ask the contractor how their deposit complies.
Use Check a License at cslb.ca.gov. Confirm the license is active, the classification fits the work (for example, B - General Building for multi-trade remodels and additions), the business name matches the bid, and review what the page shows for bond and workers' compensation.
Usually because it leaves things out. Compare plans and engineering, permit and city fees, utility connections, panel upgrades, allowances, and the exclusions list. A low price with missing scope often becomes a higher price through change orders.
Published 2026 guides put construction at roughly $300–500 per square foot, with small units and difficult sites higher. Design, engineering, and permit or city fees are usually extra. Your number depends on the site, utilities, and finish level. See our ADU page.
Only small jobs under $1,000 in labor and materials that need no permit and where the person hires no workers. Anything larger, or anything that needs a permit, requires a licensed contractor in the right classification.
Yes. Aaron works in English and Korean — 한국어로 상담 가능합니다. The AI Bid Checker also answers in Korean. 한국어 안내 보기.
Aaron Song

Written by Aaron Song — licensed architect and general contractor

CA Architect License #C-42133 · CSLB #1152969 (B - General Building Contractor) · EPA Lead-Safe Certified Firm · Master of Architecture, Harvard
Last updated November 2026. This page is general information, not legal advice or a professional opinion on any specific bid. AS Design Build may also bid on projects like yours.

Have bids that don't line up? Let's look at them together.

A licensed architect and contractor can tell you what each bid includes, what's missing, and whether you need plans first. English or Korean.

Request a Consultation